Instructions / Assembly

Milan Building Products
Stair Railing Installation Guide
Step 1 Start at the bottom of the stairway at the side the handrail installs. Position the lower post atop a
concrete landing, wood landing or deck with the attachment brackets for the handrail facing up the
stairs. Align the innermost side of the square base plate parallel with the outer face of the bottom stair.
The post aligns 3 inches inside the edge of the stairway. Use the machined holes in the base plate as
guides and mark the concrete or wood for the fastener holes.
Step 2 Set up a power drill with a 1/4-inch carbide drill bit for concrete and drill 2-inch-deep holes at
each mark. Install a 1/4-inch by 3-inch expanding-concrete anchor in each hole and set the base post in
place. Tighten the heads on each anchor with a socket and ratchet. Proceed to the following step for a
Step 3 Install a 1/4-inch wood bit in the drill. Drill 1/4-inch holes through a wood landing or deck at each
mark for the holes at the base plate. Position the post in place and align the holes. Install 1/4-inch by 4-
inch bolts through the plate at each hole. Fit a washer and nut onto the lower end of each bolt and
tighten the nuts securely with the socket and ratchet.
Step 4 Fit the upper and lower rails of the handrail section into the brackets on the lower post. Position
another post at the upper end of the section and fit the rails into the brackets on the post. Mark the
locations of the bolt holes in the base plate of the second post. Set the post and section of handrail
aside.
Step 5 Use the appropriate drill bit for concrete or wood and drill holes for anchors or bolts. Reattach
the section of railing at the lower post and fit the second post at the upper end. Attach the base plate
for the second post with the appropriate concrete anchors or bolts as before. Tighten the setscrews at
each bracket where the railings attach to the posts with the appropriate tool, such as a nut driver or
Allen key.
Step 6 Measure the distance from the second post to the outer edge of the landing at the top step.
Repeat the procedures, as necessary, to install posts and sections of railing to complete the run from
bottom to top. Cut the uppermost section of handrail to length, if necessary, by cutting the upper and
lower rails with a hacksaw.
Step 7 Measure the distance from the brackets on the post at the top of the run to the wall at the back
edge of the landing where the final section of handrail installs.
Step 8 Attach wall brackets onto the ends of the upper and lower rails with the appropriate tool. Insert
the opposite ends of the rails into the brackets on the upper post. Position the wall brackets at the face
of the wall so the upper and lower rails are 3 inches from the edge of the landing.

Summary of content (2 pages)