Installation Guide

Premium Steel Mobile Home Skirting
Product
Installation
Guide
330 Industrial Park Drive SW
P.O. Box 206
Carrollton,, OH 44615
Phone: (800) 452-0484
Fax: (330) 627-7090
Email: dma@sevenranges.com
www.dmaskirting.com
The versatile,
affordable, durable,
easy to install
alternative to other
skirting options
Framework consists of 2” X 4 boards
placed 5’ apart or 30” on center. Pipe grips
secure rebar sections that have been an-
chored into the ground.
Installation Tools Needed
Electric Saw (for framework only)
Cordless Drill or Hammer
Tin Snips
Shed-resistant Paint Roller
Level
Recommended Hardware
2” X 4” Lumber for framework (treated
recommended for bottom edge)
Galvanized roofing nails with rubber
washers OR 1” Stainless Steel screws
Galvanized J-Channel or corner protec-
tors (deck screws recommended for J-
Channel installation)
Pipe grip ties and 24” rebar sections to
secure frame at ground level
Using the spaces between the block
pattern as a guide, you may fasten
skirting to framework with either a
hammer and galvanized roofing nails
(with rubber washers) or with
stainless steel screws as seen in the
Corners can be
made by bend-
ing skirting
around or into
the corner or
can be trimmed
and J-channel
used along the
top, bottom and
end edges of
Primer and paint can be applied to
your skirting immediately, or you
may allow the skirting to “weather”
for several months and then apply
paint without primer. Check your lo-
cal home improvement store to find
the paint suitable for your location.
QUICK TIP: Shed-resistant paint
rollers will cover your skirting
quickly and beautifully.
FOR MORE INFORMATION
VISIT US AT
www.dmaskirting.com

Summary of content (1 pages)