Instructions / Assembly

Page 58 of 72
INSTALL RAMP CORNER PROTECTOR CAPS
6.2.2. Install protective caps over side rail corners by placing one cap on each side at both the
top and bottom of the ramp or ramp run (FIG. 6.8). If necessary, use silicone adhesive to
bond the cap to the ramp.
FIG. 6.8
6.3. TOUCH-UP ARCHITECTURALLY FINISHED HANDRAILS
6.3.1. As needed, use sandpaper (180 grit or equivalent) for blending scratches on
architecturally finished handrails.
Do not use on painted or powder coated surfaces.
6.3.2. Sand in direction of the grain as shown (FIG. 6.9).
FIG. 6.9
6.4. FINAL CHECKS
6.4.1. Ensure that all fasteners are in place and secure.
6.4.2. Walk on the assembled system, checking for any undue movement.
6.4.3. Remove any debris and metal chips.
6.4.4. Ensure that the level and slope has not shifted during installation.
6.4.5. Check that all handrail ends are covered (either with loops or with end caps).
6.4.6. CONGRATULATIONS! The EZ-ACCESS® PATHWAY 3G® System is assembled.