Manual

General instructions:
Installation clearances
A fire may start if this oven is not properly installed.
To reduce the risk of fire, follow these installation instructions. A major cause of
oven-related fire is failure to keep the required clearances (air spaces) from
combustible materials. It is of the utmost importance that this oven be installed only
in accordance with these instructions.
Please read this entire manual before you install the oven. Failure to follow these
instructions may result in property damage, bodily injury or even death. Contact your
local building or fire officials about restrictions and installation inspection in your
area.
CLEARANCES
I ) The Univex DOME oven must have a minimum 6" clearance from
combustibles from all sides and 16" from combustibles from the top.
If a façade that will be in contact with the oven is being built, use completely non-
combustible materials (when non-combustible building materials are in contact with
the body of the oven, the clearances from combustibles are transferred to those from
non combustibles). Please note that standard dry-wall (or sheet rock) is considered a
combustible.
II ) Any facade above and/or 6 inches to either side of the oven doorway must be
constructed of non combustible building materials
III ) Install this oven only on non combustible floors. The non combustible floor
surface should extend 40 inches out in front of the oven and extend 32 inches to
either side of the oven doorway.
Leave a clearance of at least 200cm
2
under the oven
Leave a clearance for servicing and proper operation in case you are covering the iron
stand
WARNING: installation and servicing of this product could
expose you to glass wool/ceramic fibers as well as calcium silicate dust.
ALWAYS WEAR RESPIRATORY AND EYE PROTECTION
WHEN INSTALLING OR SERVICING THIS APPLIANCE
3