Manual

10.Place removed orifice spuds in plastic parts bag for future use and keep with
literature package.
11.Install the correct injector. See the table on page 5.
12.Position the air bushing, according to the air adjustment displayed below, and
fix the bushing by screwing the screw. See also the table on page 5.
Natural gas “A” = 8mm
LP gas “A” = 41mm (Fully Open)
8