5.2. Description of the adjustment and commissioning operations
5.2.1. Installation
The machine must be positioned vertically on a smooth surface and able to support the weight (floor
with resistance above 20 kgcm
2
). The walls and the floor must be in good condition and easy to clean.
If there is a risk of overturning, anchor the machine to the floor using 4 wedges or bolts with tensile
strength greater than 300 kg (M8) with the specific anchors that can be supplied on request.
5.2.2. Electric line connection
The electrical connection must be done by a qualified electrician, according to the methods and
regulations in force in the country of installation.
The machine is supplied with power cable without plug. The cable must be kept away from hot and/or
moving parts and must not obstruct the movement or transiting of people and things. The socket into
which the plug will be inserted must have adequate features to the maximum current of absorption of
the load and comply with the laws and regulations in force (including being correctly connected to the
earthing system, which must be periodically checked by an authorised and competent technician).
Make sure that the system voltage and frequency match those on the machine
identification plate, incorrect connection voids the warranty.