Unit installation

5. PACK CONTENTS
The carton contains the following:-
1 Fire assembly.
1 Ceramic fuel base.
4 Ceramic coals.
1 Flue unit.
1 Inlet elbow.
1 Pack of fixing screws and wall plugs.
1 Wall fixing template.
1 Length of flue sealing tape.
Remove all the items carefully to prevent damage. Some items may be contained in
the packaging fitments - Examine the packaging carefully before discarding. Check
that all the items are present and undamaged.
Page 14
© Baxi Heating U.K. Limited 2010.
INSTALLER GUIDE
Figure 4.