Unit installation

8. PREPARING THE FLUE UNIT
Measure the total wall thickness
from the outside surface to the inside
face. Add 80mm to this measurement
to obtain the correct length of flue unit
required.
Mark off the flue length on the
outer (air) tube measuring from the
end of the terminal.
Insert the polystyrene ring between
the inner and outer tubes to support
them and cut both tubes squarely at
the marked distance.
Important: Remove all polystyrene
from the flue unit after cutting.
Page 19
© Baxi Heating U.K. Limited 2010.
Figure 10. Flue unit installation into a
traditional brick built wall.
INSTALLER GUIDE
Figure 11. Flue unit installation into timber framed buildings.