Water Heater User Manual

21
Appendix A
JOINT PROCEDURE
(see illustration #1 below)
1. The outside of male end and inside of female end of pipe must be cleaned before applying silicone
bead. Remove dirt, grease, and moisture from surface to be sealed. Dry surface or allow to dry
thoroughly.
2. Apply high temperature silicone approximately one half inch from end around male end of pipe and
along both sides of seam for one inch in an even 1/4” bead as per illustration #1.
3. Pipes can now be pushed together as far as they will go. The seams on pipes should be aligned and
oriented upwards in all horizontal applications. Apply another bead of silicone around this joint and
smooth out.
4. Tighten gear clamps (15 [N/LB. MAX.).
5. Check all joints and seams for tightness prior to using vent system.
6. Allow the sealant to cure for one hour before operating the appliance. Length of time required for full
cure depends upon thickness of application and other factors such as weather, ambient temperature,
humidity, etc. All sealants must be used within the time limitations marked.
CLEARANCE TO COMBUSTIBLES
SYSTEM
OPERATING
CLEARANCE
ENCLOSED
CLEARANCE
UNENCLOSED
SEALANT
REQUIRED
HORIZONTAL VERTICAL HORIZONTAL VERTICAL
300
O
F (149
O
C) 8” (200 mm) 4” (100 mm) 1” (25 mm) 1” (25 mm)
G.E 108
DOW CORNING 732
Z-FLEX Z-VENT
SEALANT
480
O
F (249
O
C) 8” (200 mm) 4” (100 mm) 1” (25 mm) N/A
G.E 106
Z-FLEX Z-VENT
SEALANT
*Note: Flexible elbows parts # SVEFEX03 AND SVEFEX04 must not be enclosed