Manual

TTRA-S2 VERSION 1.x SOFTWARE MANUAL REV 2
39
6. Click on the “OK” button. An untitled test plan with the selected parameters will be
created and displayed as shown below:
7. Enter the header information in the corresponding input fields.
8. Select the voltage regulator type from the “Type:” drown-down list. If applicable, select
the group from the “Group:” drop-down list.
9. Enter the maximum deviation percentage in the “Max Dev. %” input field.
10. Select the test voltage from the “Voltage:” drop-down list.
11. Save the test plan (see section 5.4).