Manual

REV 2 TTRA-S2 VERSION 1.x SOFTWARE MANUAL
40
6.0 RUNNING TESTS
The TTRA-S2 software can be used to run transformer, load tap changer, and voltage regulator
tests directly from the PC. This is especially convenient when used in conjunction with a test
plan.
6.1 Running a Transformer Turns Ratio Test Using a Test Plan
Follow the steps below to perform a transformer turns ratio test using a test plan (the same
procedure also applies for performing load tap changer and voltage regulator tests):
1. Make sure the ATRT is properly connected to the PC either via the USB or RS-232C port.
Also ensure that the TTRA-S2 software is properly configured to use the selected
interface port. See section 3.2 for details.
2. Connect the H and X leads per the ATRT’s user’s manual.
3. Click on the Test-Xfmr menu and select Run Test Plan... The following window will be
displayed: