Operation Manual

Instruments and controls 77
1. Press Summer Start.
2. Press + or to set the month and
day for the start of summer.
3. Press Winter Start.
4. Press + or to set the month and
day for the start of winter.
5. Press Edit Summer Schedule or
Edit Winter Schedule to edit the
daily electric rate schedule.
Electric rate schedule editing
From the Enter Summer/Winter Start
Dates screen, press Edit Summer
Schedule or Edit Winter Schedule.
From the Select Electric Rate Plan
screen, press Yearly Schedule and
then press Edit.
1. Press Weekday or Weekend.
2. Press Edit next to the row to be
changed.
Weekdays are Monday to
Friday and use the same rate
schedule.
Weekends are Saturday and
Sunday and use the same rate
schedule.
Both weekday and weekend
schedules must be set. The rate
schedule only applies for a 24 hour
period, starting at 0:00 and ending at
0:00. There can be five rate changes
for each day; not all must be used.
The finish times must be consecutive.
If a finish time does not follow a start
time, an error message displays.
Follow the instructions given by the
message.
Electric rate finish time editing
From the respective electric rate
schedule screen, press Edit next to
the row to change.
1. Press + or to adjust the time.
2. Press Peak, Mid-Peak or Off-
Peak to select the electric rate.
3. Press Back to store changes.
Only the finish time can be edited.
The start time is automatically
populated in the rate table.