Installation Instructions

8
Brig HRV 120 (170)
To attain the best performance of the unit while mounting provide a straight 20’
(500 mm) duct section in front and behind the unit. The unit must be equipped with a grille with the
mesh width up to 1/2” or any other protecting device to prevent free access to the unit fans.
CONDENSATE DRAINAGE
The unit is equipped with a condensate drain hose for condensate drainage (g. 5).
Connect the drain hose (1), U-trap (3) and drain system (5) with metal, plastic or rubber pipes (2 and 4).
The pipes must be sloped down at least by 3°. Before starting operation of the unit ll the system with
water and check that U-trap is always lled with water. Make sure that the water drainage is correct,
otherwise some condensate may be accumulated inside the unit and provoke subsequent equipment
damage and water ingress to the room. The condensate drainage system is designed for operation at
the ambient temperature above 32 ºF(0 °С). If the ambient temperature is below 32 ºF(0 °С), insulate
the drain system and provide air heating.
g. 5. Condensate drainage
min 3°
1
3
5
2
4