Installation Guide

Table Of Contents
Installation Instructions
27 of 44
IM-PP 724607 0320 ProPress
"
#
$
Tube
Diameter
(inches)
A
minimum
(inches)
A
minimum
(mm)
B
minimum
(inches)
B
minimum
(mm)
C
minimum
(inches)
C
minimum
(mm)
2⅜ 60 5 127 2
3
/
16
56
2 2
9
/
16
65 121 3
9
/
16
65
Table 11: ProPress rings with V2 Actuator clearance requirements between tube, wall,
and 󶈶oor
Tube
Diameter
(inches)
A
minimum
(inches)
A
minimum
(mm)
B
minimum
(inches)
B
minimum
(mm)
C
minimum
(inches)
C
minimum
(mm)
½ 1⅝ 41
83
2 51
¾ 45
1⅞ 481 2 51
2
3
/
16
55 3⅜ 86
Table 12: ProPress rings with C1 Actuator clearance requirements between tube, wall,
and 󶈶oor
Tube
Diameter
(inches)
A
minimum
(inches)
A
minimum
(mm)
B
minimum
(inches)
B
minimum
(mm)
C
minimum
(inches)
C
minimum
(mm)
6
3
/
16
157 6
15
/
16
176
2
7
/
16
623 7
7
/
16
189 8
13
/
16
224
4 8
1
/
16
205 10
7
/
16
265
Table 13: ProPress XL-C rings dimensions
Tube Diameter
(inches)
A minimum
(inches)
A minimum
(mm)
B minimum
(inches)
B minimum
(mm)
4⅛ 105 6 152
3 4⅜ 111 7 178
4 5 127 8 203
Table 14: ProPress XL-C rings clearance requirements
Tube
Diameter
(inches)
A
minimum
(inches)
A
minimum
(mm)
B
minimum
(inches)
B
minimum
(mm)
C
minimum
(inches)
C
minimum
(mm)
4⅛ 105 6 152 114
3 4⅜ 111 7 178 4⅞ 124
4 5 127 8 203 146
Table 15: ProPress XL-C rings clearance requirements between tube, wall, and 󶈶oor
B
A
B
C
A
B