Unit installation

12
Checking the static and the supply pressure
Static pressure
87 kW
115 to 311 kW
A
1. Close the gas shut-off valve.
2.
Undo the screw in test nipple A, but
do not remove.
3. Connect the pressure tester at test
nipple
A
.
4. Open the gas shut-off valve.
5. Check the static pressure (max.
60 mbar).
6. Record the actual value in the report
(on page 61).
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5692 907 GB