Unit installation

48
After the controller issues a heat
demand, the following program
sequence will be run:
Phase Duration
01 Test for heat demand 1 s
02 Checking the idle state of the air pressure switch and the
fan
1 to 30 s
03 Fan ramps up to speed (a fault shutdown will be initiated
if the air pressure switch does not report within this time
that the air pressure has reached a defined range, or if
the fan does not reach its set speed)
1 to 30 s
04 Pre-purge I 5 s
05 Pre-purge II 1 s
06 Pre-purge III 30 s
07 Ignition setting (the burner control unit will enter a fault
state if the fan does not achieve its set speed)
1 to 30 s
08 Pre-ignition 2 s
09 Safety time, start (safety time A) (enabling the safety
valves at the start of safety time A, safety time, operation
< 1 s); (no gas pressure switch monitoring)
2 to 10 s
10 Stabilising the flame in the ignition position 20 to 60 s
11 Changing to the control mode (ramps to the set speed
selected at the control unit)
1 to 30 s
12 Operation (the system will be restarted after expiry of this
time)
max. 23:59 h
13 Burner run-on time max. 30 s
17 Post-purge 1 to 60 s
18 Restart blocking time 0 s
19 Gas shortage position max. 30 min
20 Standby
(a restart follows a heat demand and the system restarts
after expiry of this time)
max. 23:59 h
In the case of fault shutdown from phase 09:
21 Fan run-on before lockout 5 s
Burner control unit flow chart
Burner control unit flow chart
(cont.)
5692 907 GB