Unit installation

5
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps Page
1. Checking the high limit safety cut-out setting............. 7
2. Filling the heating system with water and venting the
system............................................................................. 7
3. Filling the siphon with water......................................... 7
4. Commissioning the system........................................... 7
5. Checking the gas type.................................................... 9
6. Converting to natural gas LL......................................... 9
7. Checking the static and the supply pressure.............. 12
8. Checking the CO
2
content.............................................
14
9. Checking the CO content
10. Checking the flue gas temperature
11. Checking the ionisation current.................................... 19
12. Shutting down the system............................................. 20
13. Opening the boiler door................................................. 20
14. Separating the neutralising system (if installed) from
the boiler and connecting the drain hose.................... 20
15. Cleaning the combustion chamber and heating
surfaces........................................................................... 20
16. Checking gaskets and thermal insulation parts.......... 21
17. Checking all connections on the heating water side
and the sensor well for leaks......................................... 22
18. Cleaning and reconnecting the condensate drain
system............................................................................. 22
19. Checking the condensate drain and the neutralising
system (if installed)........................................................ 23
20. Checking the burner gauze assembly.......................... 24
Commissioning, inspection, maintenance
Steps – commissioning, inspection and maintenance
5692 907 GB