Technical data

18
5584 069 - 05
Vitocrossal 200, CM2 400, 500, 620 and 620 TX Installation
Rails and Supports
1. Insert four M6 x 10 screws halfway into each side
of the top and base frame.
2. Hook the top LH and RH rails onto the top frame
using the keyholes.
3. Hook the bottom LH and RH rails onto the base
frame, so that the rails protrude to the rear.
4. Make sure the top rails are aligned at the front
(see A). Then tighten all screws to secure each rail.
5. Install bottom plate brackets using two M6x15 screws
per bracket. Pre fit the side and top panels to allow
for rail alignment. Once rails are aligned, remove the
side and top panels and tighten screws (see pages 18
and 28 for panel installation).
Legend
A Rail alignment
B Rails on top frame
C Rails on base frame
D Body supports (included with the boiler)
Boiler
Side Panels
Legend
A Side panel, front
B Side panel, centre
C RH rear side panel
Note: Adjust the side panels to line up with the front
panel A before securing with screws.
1. Install left center side panel E. Observe aligning
notches and cutouts.
2. Install right center side panel B. Observe aligning
notches and cutouts.
3. Install right front side panel A. Observe aligning
notches and cutouts.
4. Install left front side panel F. Observe aligning
notches and cutouts.
5. Install rear left side panel D. Observe aligning
notches and cutouts.
6. Install right rear side panel C. Observe aligning
notches and cutouts.
7. Secure side panels to the top rails with two 2.8 mm
screws per panel.
D LH rear side panel
E Side panel, centre
F Side panel, front