Technical data

21
5584 069 - 05
Vitocrossal 200, CM2 400, 500, 620 and 620 TX Installation
Boiler
Front Side Panels
Legend
A Clips (included in the accessories package).
The gas train on the burner meets the requirement
of ASME/CSD-1.
1. Cut out the aperture in front side panel either left
or right.
Note: For ease during burner maintenance, route the gas
supply pipe from the opposite side of the burner
hinges (otherwise the panel cannot be removed
when swinging burner left or right). See page 13.
2. Fit two clips A per side panel (included in the
accessory pack).
3. Using the clips hook front side panels C and D into
side panels E and F.
4. Loosely secure front side panels C and D to the top
rails with one screw M6 x 10 per panel.
5. After hooking in the side panels, align supports B
and secure to the side panels with one screw
M6 x 10 each.
Bottom Plate
1. Install bottom plate A between the side panels.
2. Align and secure with screws.