Technical data

28
5584 069 - 05
Vitocrossal 200, CM2 400, 500, 620 and 620 TX Installation
Top Panels
1. Secure the front edge of central top panel A to the
tie-bar with two 4.8 mm screws and secure the back
of the panel to the LH and RH top rails with one
4.8 mm screw each.
2. Secure cover B to the tie-bar with two 4.8 mm
screws.
3. Secure front top panel C to the front side panels
with two M6 screws.
4. Position LH rear top panel D. Then position RH
rear top panel E. Where they overlap in the middle,
secure both rear top panels to the central top panel
with one 4.8 mm x 38 mm screw.
5. Secure RH rear top panel E and LH rear top panel
D to the back panel with one 4.8 mm screw each.
Front Panels
1. Attach four clips E (included with the fixings) to the
bottom front panel.
2. Hook bottom front panel C into the front side
panels.
3. Screw two profile studs B into top front panel D.
4. Position top front panel D onto bottom front panel
C.
5. Fit top front panel D so that the profile studs B
at the top lock into the side panels. Secure with a
M5 screw.
6. Affix type plate A to a side panel on the accessible
side.
Top Panels
Boiler