Operating instructions

59
Installation
Inserting cables and applying strain relief
Installing the control unit on the boiler
Route cables from below through the front panel of the boiler into the wiring
chamber of the control unit.
Installing the control unit on the boiler side
Route cables from below, out of the cable channel into the control unit.
A Cables with moulded strain relief
B On−site cables
Strip a maximum of 100 mm off
the cable insulation.
5862730GB
A
B