Operating instructions

13
Balanced flue connection
Connect the balanced flue.
During installation and positioning of the
flue gas system, observe building regu-
lations part L and BS 5440.
Flue gas system installation
instructions.
Opening the control unit
4x
3.
2.
1.
2x
Installation sequence
Installing the boiler and making all connections
(cont.)
5366 836 GB
Installation