Operating instructions

17
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps Page
1. Filling the heating system.............................................. 18
2. Venting the boiler by flushing out (after venting
system)............................................................................ 20
3. Adjusting circulation pump to suit heating system.... 20
4. Changing to operation with LPG................................... 21
5. Checking the CO
2
or O
2
content....................................
22
6. Burner removal .............................................................. 24
7. Checking the burner gasket and the burner gauze
assembly......................................................................... 25
8. Checking and adjusting electrodes.............................. 26
9. Cleaning the heat exchanger......................................... 26
10. Checking the condensate drain and cleaning the
siphon.............................................................................. 28
11. Burner installation ......................................................... 29
12. Checking all connections on the heating water side
and DHW side for leaks
13. Checking electrical connections for tightness
14. Check gas equipment for tightness at operating
pressure .......................................................................... 30
15. Fitting the front panel..................................................... 30
16. Instructing the system user........................................... 31
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5366 836 GB
Service