Operating instructions

5
Vitodens 100-W, WB1B
Set up for operation with natural gas.
Preparing for installation
Preparing the boiler installation
Dimensions and connections
≥ 5
≥ 250
68
400
725
58 58
123123
B
A
C E FD
G
156
a
125
31
A
Condensate drain: Plastic pipe 7
22 mm
B
Heating flow
C
Gas fired condensing boiler:
Cylinder flow
Gas fired condensing combi boiler:
DHW
D
Gas connection
Preparing for installation
Product information
5366 836 GB
Installation