Operating instructions

9
Removing the front panel and mounting the boiler
2.
3.
1.
2x
1. Release screws at the bottom of the
boiler; do not remove completely.
2. Remove front panel.
3. Hook the boiler into the wall
retainer.
Installing connections on the water side
For fittings on the heating water side and DHW side, see separate installation
instructions.
Installation sequence
Installing the boiler and making all connections
5366 836 GB
Installation