Instructions / Assembly

MILANO 200 INSTALLATION INSTRUCTIONS PAGE 11
SURFACE INSTALLATION
PULL BAR
Q
Q
O
P
B
9.1
U
PULL BAR
Q Q
O
P
OPTIONAL • INSTALLING SLIDE BOLT RETAINERS
(APPLICABLE ONLY IF STEP FOUR WAS IMPLEMENTED)
Close the screen doors. Now, on the B-Bottom Guide Rail and the C-Top Guide
Rail, make pencil marks to the center of the channel in which you’ve installed the
Slide Bolts.
Center the P-Slide Bolt Retainer to your channel mark, with the
bottom of the Retainer flush to the bottom of the B-Bottom Guide Rail.
Pencil mark the position for the screws, set the Retainer aside, and drill 1/8”
holes. Then attach the P-Slide Bolt Retainer using (2) Q-#4 x 3/8”
Phillips Panhead Screws [9.1].
Position the P-Slide Bolt Retainer so that it also centers to the channel
mark, with the bottom of the Retainer flush with the bottom of the C-Top
Guide Rail. Pencil mark the position for the 4 screws, set aside the Retainer
and drill 1/8” holes. Attach the P-Top Slide Bolt Retainer using
(4) Q-#4 x 3/8” Phillips Panhead Screws [9.2].
9
9.2