Instructions / Assembly

EXISTING SIDE RAIL PREPARATION with SHIMS
INSTRUCTIONS: Since there are multitudes of door master frame
designs, all surfaces where you will be mounting the screen must
be considered before you install the retractable screen.
In the case of the side rails, again, existing door frames may have
multiple channels, or flanges of different heights, that make for a
surface too uneven for efficient installation of your new screen. In this
case, you will need to shim this channel or channels to the height of
the tallest flange in the existing side door frame. It is recommended you
order or find shims made of a non-degradable material (plastic or nylon,
for example) that can be fitted into the channel(s), of sufficient length
to assure a flat and vertically plumb surface for the new side rail.
A1
Existing
Side
Door
Frame
Shims to
Flatten
Install
Surface
INSTALLATION BULLETIN
for TOP AND SIDE GUIDE RAILS
INSTALLATION BULLETIN for TOP & SIDE GUIDE RAILS 4