- VULCAN-HART COMPANY GAS BROILER SERVICEMANUALHCB40 ML-052211 GHCB44 ML-052213 GHMCB44 ML-052214 HCB1 ML-052202 HCB2(B) ML-052208 IR1 ML-052200

– 13 –
BURNER ASSEMBLY
GHCB40 & HCB2(B)
WARNING: SHUT OFF THE GAS BEFORE
SERVICING.
1. Remove the burner ceramics as outlined under
Burner Ceramics.
2. Remove burner box cover as outlined in
Controls, Panels and Handles.
3. Allow the burner assembly to cool.
4. Lift the rear of the burner assembly and remove
it from the broiler.
CAUTION: Make sure that you do not damage the
pilot nozzle when you remove the burner
assembly.
5. Reverse the procedure to install.
GHIR44
WARNING: SHUT OFF THE GAS BEFORE
SERVICING.
1. Allow the burner assembly to cool.
2. Lift the rear of the burner assembly off the
alignment pins.
3. Carefully move the burner assembly to the
rear of the broiler and then remove burner
from the broiler.
CAUTION: Make sure that you do not damage the
pilot burner nozzle when you remove the burner
assembly.
4. Reverse the procedure to install.