- VULCAN-HART COMPANY GAS BROILER SERVICEMANUALHCB40 ML-052211 GHCB44 ML-052213 GHMCB44 ML-052214 HCB1 ML-052202 HCB2(B) ML-052208 IR1 ML-052200

– 24 –
Regulator [HCB2(B)]
WARNING: SHUT OFF THE GAS BEFORE
SERVICING.
WARNING: ALL GAS JOINTS DISTURBED
DURING SERVICING MUST BE CHECKED FOR
LEAKS. CHECK WITH SOAP AND WATER
SOLUTION (BUBBLES). DO NOT USE AN OPEN
FLAME.
1. Disconnect the gas supply tube and the burner
tube.
2. Remove the regulator from the broiler.
3. Reverse the procedure to install.
Solenoid (GHIR44)
WARNING: DISCONNECT THE ELECTRICAL
POWER TO THE MACHINE AND FOLLOW
LOCKOUT / TAGOUT PROCEDURES.
WARNING: SHUT OFF THE GAS BEFORE
SERVICING.
WARNING: ALL GAS JOINTS DISTURBED
DURING SERVICING MUST BE CHECKED FOR
LEAKS. CHECK WITH SOAP AND WATER
SOLUTION (BUBBLES). DO NOT USE AN OPEN
FLAME.
1. Open the lower doors to get access to the
solenoid.
2. Note the location and connection of the
electrical wires.
3. Disconnect the electrical wires.
4. Disconnect the solenoid from the burner pipe
and the regulator.
5. Remove the solenoid from the broiler.
6. Reverse the procedure to install.