User manual

EN
SinePower Connecting the inverter
47
Set the main switch (fig. 5 3, page 4) to “OFF” and make sure that the
connection for the remote control (fig. 5 12, page 4) is not assigned.
Set the main switch (fig. 5 3, page 4) to “REMOTE”.
Connect the external on/off switch with the connection cable to the green
terminal (fig. 5 11, page 4).
9.9 Connecting parallel operation
A
Set the main switch (fig. 5 3, page 4) to “OFF”.
Connect the inverter according to the sample circuit diagram (fig. b,
page 7).
In particular, make sure that the bridges for parallel operation are set
correctly:
Bridge removed (fig. b 1, page 7) for inverter A and set for inverter B and
C.
I
NOTICE!
Use a cable with a cross section of 0.25 – 0.75 mm² for con-
necting to the terminals for parallel operation.
Parallel operation can only be set up using the same models
(same item number).
A maximum of three inverters can be operated in parallel.
The inverters operating in parallel must have the same set-
tings for mains voltage and mains frequency. (see chapter
“Configuring the inverter” on page 50.
NOTE
The first inverter which is switched on after installing parallel
operation is the master.