Nailed Down Hardwood Installation

TempZone Flexroll Hardwood
Installation Overview
STEP 1: Install Wood Sleepers
Install wood sleepers (strips of wood 1" to 2" wide and 3/8" to
1/2" high) at nail spacing requirements specified by the
manufacturer. The sleepers are installed to create lanes into
which the warming system will be placed. The flooring should
be installed as per the flooring manufacturer's requirements.
Verify with the manufacturer that the flooring has been
approved for this use. Supply WarmlyYours with nail spacing
parameters and the Smartplan will be drawn accordingly.
STEP 2: Lay The Heating System
Cut and turn the rolls to fit into the lanes created by the
sleepers.
STEP 3: Cover Rolls With Self Leveling Cement
Once the system is in place, the warming roll should be
covered with self leveling cement up to and even with the top
of the wood sleepers.
STEP 4: Install Hardwood Flooring
Once the self leveling cement has dried and cured to the
manufacturer's specifications the hardwood floor can be
installed by nailing it into the wood sleepers. Be careful not to
place nails or staples near the heating cable or power leads.
Follow These Steps When Installing a System Under
Hardwood Floor Covering

Summary of content (1 pages)