Installation Guide

5
wedi Fundo
®
Primo Tools needed for installation | Herramientas necesarias para la instalación | Des outils sont nécessaires pour l’installation
EN
ES
FR
Bucket
Utility Knife
Caulk Gun
Flat Head Screwdriver
Paper Towels
Saw Horse
Extension Cord for Powertools
Speed Square
Handsaw
Solid Putty Knife
Circular Saw
Permanent Marker
Safety Glasses
wedi
®
Corner Putty Knife
Respirator Mask (N95)
Cubo Taladro con mezcladora
Cuchillo multiuso de mortero cola
Escuadra triangular de acero Serrucho
Desarmador de punta plana Espátula sólida
Papel absorbente Sierra circular
Caballete Rotulador permanente
Cable de extensión para Gafas de seguridad
herramientas eléctricas Espátula para esquina wedi
Seau Perceuse avec mélangeur
Couteau universel de ciment-colle
Équerre triangulaire Couteau à mastiquer rigide
Tournevis à bout plat Scie circulaire
Essuie-tout Marqueur permanent
Chevalets Lunettes de protection
Rallonge pour outillage électrique
Couteau à mastiquer
Masque respiratoire (N95)
1/4 in. square Notch Trowel
Straight Edge /
T Square 5 ft (1524 mm) or longer
Screw gun w/ Phillips bit
Level
Tape Measure
Shop vacuum cleaner
Drill with Thinset Mixer
Llana ranurada
Regla o regla T de al menos 5 ft (1524 mm)
Pistola para calafatear
Pistola atornilladora
Nivel
Cinta métrica
Aspiradora de taller
Máscara de respiración (N95)
Truelle dentelée
Règle/Équerre en T de
(1524 mm)
ou plus
Pistolet à calfeutrer
Pistolet à vis
Niveau
Mètre ruban
Aspirateur d’atelier
Scie égoïne les angles wedi
Have 2 × 4‘s blocks installed on base plate between and ush with front of
wall framing studs to best support wedi wall panel / shower base transition.
Suboor is stable and loadbearing, at and level, and meets deection crite-
ria of maximum L/360 as per IRC. Wooden or concrete structural substrates
are dry and sufciently loadbearing considering live and dead load. Wood
and Steel framing is sufciently loadbearing, even, plumb and square.
Floor drain assembly below oor is stabilized, xed and supported in po-
sition, and will not sink under water load. Waste pipe is level and plumb.
Only wedi products (Building Panels, Curb, Joint Sealant and Fasteners)
are used for wedi Fundo Shower System assembly.
Installer has received instructions from wedi technical sales staff or is in-
formed about proper installation methods as described.
wedi shower bases can be cut to size using a circular saw.
Follow applicable state or local plumbing codes requiring specic and
dimensioned waterproofed areas for a shower system or other wet room
installation. Requirements in this manual supersede local plumbing codes;
they extend and are not in conict. wedi Shower Systems or other wet
room installations in which non-wedi product is also used require specic
project recommendations by wedi and may reduce the extent and installation
area of protection offered by wedi’s warranty.
EN
Ensure that no fasteners are used and penetrate through any horizontal building
panel or shower base surfaces in shower or immediate wet rooms. This includes
tub decks, pony shower wall tops, curb tops made from building panels, seat
tops. wedi panels in such areas are installed in a full surface applied thinset
mortar setting bed.
Seams in the assembly, which are not flat transitions or right angle inside corner
connections, are treated with these extra steps:
1) Assembly parts are installed tight and offer a minimum of 1/2 in. wide con-
tinuous contact/adhesion surface between two parts, inside which wedi
®
Joint Sealant is continuously applied.
2) wedi® Joint Sealant is applied over these seams topically, and 1 in. wide
on both sides of the seam.
3) wedi sealing tape is installed over these seams and covered with joint
sealant 1 in. wide on both sides of the seam.
Prepare the installation / installation site