Product Brochure

03 04
06
Insert wedi Subliner Dry with the
printed side facing upward and
press on with a rubber roller or
wooden float. Remove airpock-
ets and other foreign particles
from below the sheets.
The sheets must overlap 2”
(50.8 mm) at joints / transitions.
Leave these overlapping areas
free of any thinset and use tape
to keep them folded upward
and / or clean. Once the thinset
has cured, apply wedi Sealant
620 as a full bed onto the lower
mat’s seam connection area
and press the top overlap flat
into the wedi Sealant 620.
01 02
Lay out wedi Subliner Dry and
cut to size using a knife or
scissors.
Apply thinset mortar to the
prepared subfloor using a
1/8 ×
1/8”
(3.2 × 3.2 mm)
or
1/4 × 1/4”
(6.4 × 6.4 mm)
notch
trowel.
05
Spread flat all wedi Sealant
620 using a putty knife. Cross
joints should be avoided.
In complete wet rooms, wedi
recommends to flash Subliner
Dry up the wall by 2
(50.8 mm)
where it is still invisible behind
baseboard tile or wood appli-
cations.
07
Start setting tile once wedi
620 Sealant has been allowed
to cure for 24-hours. Exposure
to water is possible after 48-
hours providing that the wedi
620 Sealant is dry to the touch.
The wedi 620 Sealant is mois-
ture curing and may require
extended cure times in dry and
cold climate, or when installed
below epoxy setting materials
and/or larger format, dense tile.
wedi Subliner
®
Dry
Installation on Floors or other suitable,
non waterproof underlayments or
substrates
105105