Product Brochure

For more detailed installation steps and information please visit www.wedicorp.com
wedi Fundo OneStep Shower System Product Information
These added values and its detail perfections eliminate the technical concerns in shower installations. However, this is not where wedi shower systems stop
offering its added values. The wedi Fundo shower system adds to your productivity and enables you to provide real value to your customers. Our wedi Fundo
Shower systems reduce the installation time for just the shower floor from a 2 3 day process (includes drying times) to only 30 minutes when compared to
traditional methods built with pre slope, vinyl liner and final mortar bed. wedi helps you to turn showers into service quicker, cleaner and safer. Especially
for our contractors, Fundo Primo helps to get to setting tile faster and on a much more consistent and tile friendly surface. Customers will appreciate the
“no noise and no dirt/dust“ installation. The wedi products do not contain harmful ingredients providing peace of mind to contractors and end users.
Fundo base with integrated wall and curb
Passes ANSI Z124.1.2 / National Approval ICC PMG Report 1189
3 different sizes with custom options
Use with wedi Building Panels or other types of backer board (most will require added waterproofing)
Solid, pre-sloped, directly tileable surface
Can be used with small & large format tile; set with modified thinset
Square, high quality stainless steel drain cover / frame
No seam & no leak potential due to installation mistakes
Easy drain hook-up to floor pipes cut flush with subfloor
Subfloor attachment with only thinset adhesive
wedi OneStep requires no thick mortar bed underneath unlike common competitive preformed units which require added support
No more epoxy thinset tiling as with other common preformed units
Caulking nut
Rubber caulking gasket
Fiber gasket
Drain body
ABS to ABS seal with wedi Joint Sealant
Locking nut
Rubber gasket
2 in.
(50.8 mm)
Note for Installation
Optionally a glue drain can be obtained from wedi. For a cement glue connection, the floor pipe must be cut 2 1/4” below the surface of the subfloor.
Optionally a brass drain can be obtained from wedi. The installation proceeds as shown for the standard ABS drain provided with each Fundo Primo base.
Drain to Base Assembly
36