Product Brochure

20
wedi Fundo Ligno Installation
Before Installation:
Have extra 2 × 4 blocking installed over bottom plate between studs
along to support wedi Building Panel to shower base transition area.
After recessing or when system is installed over regular suboor, sub-
oor is stable, even and loadbearing, and meets deection criteria of
maximum L/360 and requirements as per IRC. Wooden or concrete
structural substrates are dry and sufciently loadbearing considering
live and dead load. Wood and Steel framing is sufciently loadbea-
ring, plum and square.
Floor drain assembly below oor is stabilized, xed and supported in
position, and will not sink under water load.
Only wedi products (Building Panels, Curb, Joint Sealant and Faste-
ners) are used for wedi Fundo Shower System assembly.
Installer has received instructions from wedi Technical Sales Staff or is
informed about proper installation methods as described.
wedi Shower Bases can be cut to size using a skilsaw. The Z notch
channel must be remade and cleaned from sawdust or other possible
contamination.
Follow applicable state or local plumbing codes requiring specic
and dimensioned waterproofed areas for a shower system or other
wet room installation. Requirements in this manual supersede local
plumbing codes; they extend and are not in conict. wedi Shower
Systems or other wet room installations in which non-wedi product
is also used require specic project recommendations by wedi and
may reduce the extent and installation area of protection offered by
wedi’s warranty.