Installation Guide

Set up a continuous
1
/2
bead of wedi point sealant at
the perimeter channel and only
in areas where you
can immedi-
ately install a wedi building
panel into the fresh sealant.
Push the wedi panel all the
way into the channel of the
shower base channel and its
bead of sealant. Remove
pushed out sealant on inside
seam using a putty knife. Fas-
ten the panels directly to the
studs starting 1 ft above the
base and at a rate of 1 fastener
per 1ft. One extra fastener is
set into the seam to the next
panel to crate a flush transi-
tion.
Apply a skim coat and fi-
nally a combed through bed of
a thinset using modified thin-
set ANSI 118.4 and
1
/4” x
1
/4
notch trowel.
Trowel the thinset on the
rear side of the Fundo again
using a
1
/4” x
1
/4” notch trowel.
Press the Fundo firmly into
the thinset bed, ensuring that
the installation is level and void
free. Ensure wedi drain's sealing
gasket is firmly inserted in the
wedi trap. Apply some weight
equally and for at least 30 min-
utes (thinset bags).
Glue and seal the wedi
drain trap to the 2” pipe.
Mount the sealing collar to
the wedi Riolito/Riofino
underside counterpart using a
manual phillips screwdriver.
Assembly Instructions
wedi Fundo Riolito/Riofino
Assemble the drain unit
following the instruction
drawing. wedi's Riolito bases
can be cut to size on all sides
making drain positions close to
the wall possible. Please do not
cut into the linear drains plastic
flange integrated into the coated
foam part of the base. Once
cut the
1
/2” x
1
/2” channels at
the new base perimeter must
be reestablished.
Cut the 2
pipe 1
1
/4
below
the top of the Subfloor. Use the
oval shape cutting template to
cut subfloor using a jigsaw to
allow wedi drain trap to be in-
serted and connected to floor
pipe using appropriate ABS com-
patible or multipurpose cement
glue. Please also check cement
glue compatibility to floor pipe
material.
The drain and trap
have to be secured to the sub-
floor.
Installing wedi
®
Fundo Shower Base onto wooden or concrete floors
3
5
7
4
6
8
1 2
wedi_MA_Fundo_Riolito-Riofino_USA_2014_4C_v3_rz_Layout 1 09.12.14 08:32 Seite 4