wedi Fundo Riolito neo Installation
Before Installation:
Have extra 2 × 4 blocking installed over bottom plate between studs
along to support wedi Building Panel to shower base transition area.
Suboor is stable, even and loadbearing, and meets deection criteria of
maximum L/360 and requirements as per IRC. Wooden or concrete structu
-
ral substrates are dry and sufciently loadbearing considering live and dead
load. Wood and Steel framing is sufciently loadbearing, plum and square.
Floor drain assembly below oor is stabilized, xed and supported in
position, and will not sink under water load.
Only wedi products (Building Panels, Curb, Joint Sealant and Faste-
ners) are used for wedi Fundo Shower System assembly.
Installer has received instructions from wedi Technical Sales Staff or is
informed about proper installation methods as described.
wedi Shower Bases can be cut to size using a skilsaw. The Z notch channel
must be remade and cleaned from sawdust or other possible contamination.
Follow applicable state or local plumbing codes requiring specic and
dimensioned waterproofed areas for a shower system or other wet
room installation. Requirements in this manual supersede local plum-
bing codes; they extend and are not in conict. wedi Shower Systems
or other wet room installations in which non-wedi product is also used
require specic project recommendations by wedi and may reduce the
extent and installation area of protection offered by wedi’s warranty.
01 02 04
Cut the 2” (50.8 mm) pipe 1
1/4” (31.8 mm) below the top
of the Suboor. Use the oval
shape cutting template where
you want to position the drain
to cut out subfloor using a
jigsaw to allow wedi drain trap
to be inserted and connected to
oor pipe using appropriate ABS
compatible or multipurpose ce
-
ment glue. Please also check ce-
ment glue compatibility to oor
pipe material. The drain and trap
have to be secured to the subf
-
loor. Drain recess cut out must
not add deection to suboor.
Assemble the drain unit
following the instruction
drawing. wedi‘s Riolito neo
bases can be cut to size on all
sides making drain positions
close to the wall possible. Ple-
ase do not cut into the linear
drains plastic ange integrated
into the coated foam part of the
base. Once cut the 1/2” × 1/2”
(12.7 × 12.7 mm) channels at
the new base perimeter must
be reestablished. When cutting
close to the drain channel al-
ways leave enough wedi foam
for re-making the needed
1/2“ × 1/2“ (12.7 × 12.7 mm)
channel.
03
Glue and seal the wedi drain trap
to the 2” (50.8 mm) pipe using
appropriate solvent cement glue
for the plastics involved. Do
not screw drain body/trap to
oor. Secure with some dabs of
wedi Joint Sealant under ange
instead. Mount the oval sealing
collar / gasket to the base‘s recei
-
ving ABS plastic channel on it‘s
underside with no gaps showing
in between both parts. Use only
the wedi screws provided and
manually tighten with a Phillips
screwdriver. Instead of gluing
the drain trap to the oor pipe
rst, you may also connect it to
the wedi Base‘s sealing gasket
rst to ensure a visibly tight con
-
nection. The trap will then glued
to the oor pipe later when the
base is installed to the oor.
Apply a skim coat and nally
a combed through bed of a
thinset using modied thinset
ANSI 118.4 and 1/4” × 1/4”
(6.4 × 6.4 mm) notch trowel.
There are different ways to
ensure good bond of the wedi
Base to the suboor. Requi
-
red is a setting bed thickness
of min. 3/16“
(4.8 mm)
and
max. of 5/16“
(7.9 mm)
(com-
pressed). Applying thinset on
both, wedi Base and suboor,
is a best practice recommen
-
ded to achieve full surface co-
verage adhesion. Another best
practice is to use fast setting
mortar to achieve faster bond
and adhesion.