Instructions

Change the IP address and subnet mask as required
and click on Assign IP configuration.
To change the device name, enter the new name and
click on Assign name.
If you would like to change the properties of other partici-
pants, click once again on Browse and select the next
participant.
Make the changes as described above.
When you have finished editing all of the participants,
click on Close.
These settings are sent directly to the devices!
Savingtheconguration
You can save your project in the hardware conguration
tool at any time and continue working on it at a later point
in time. There are two ways to save the settings you have
made:
Click Station/Save to save the configuration in its cur-
rent state. Use this function if you would like to stop
working for a short period of time.
Click Station/Save and translate to save the configura-
tion in its current state and translate it into the data-trans-
fer language. Always use this function when you have
finished working on the configuration and want to trans-
fer it to the control unit.
Loadingthecongurationintothecontrolunit
Navigate to the hardware configuration tool.
If not already done, save the configuration via Station/
Save and translate.
To load the configured project into the control unit, open
Target system/Load in components.
Select the target component and click on OK.
The project is transferred to the connected control unit.
Any changes made later to the conguration
take effect only after you reload the project in
the control unit.