Install Instructions

Part Number 550-142-782/1112
4
EG
&
PEG SERIES 5
s
EGH SERIES 5 GAS-FIRED BOILERSBOILER MANUAL
Installation must follow these codes:
s Local codes, laws, provincial and national codes, laws, regulations and ordinances
s .ATIONAL&UEL'AS#ODE!.3):LATESTEDITION
s 3TANDARDFOR#ONTROLSAND3AFETY$EVICESFOR!UTOMATICALLY&IRED"OILERS!.3)!3-%
CSD-1, when required
s .ATIONAL%LECTRIC#ODE
The equipment shall be installed in accordance with those installation regulations in force
in the local area where the installation is to be made. These shall be carefully followed in
all cases. Authorities having jurisdiction shall be consulted before installations are made.
Canadian installations must comply with CAN/CSA B149.1 or B149.2 Installation Codes.
Commonwealth of Massachusetts
When the boiler is installed within the Commonwealth of Massachusetts:
s 4HISPRODUCTMUSTBEINSTALLEDBYALICENSEDPLUMBER
s )FANTIFREEZEISUSEDAREDUCEDPRESSUREBACKmOWPREVENTERDEVICESHALLBEUSED
Certification
Safe operating and other performance criteria were met with the gas mani-
fold and control assembly provided on boiler when boiler underwent tests
SPECIlEDIN!.3):LATESTEDITION
Before locating the boiler:
Check for nearby connection to:
s6ENTINGCONNECTIONS
s'ASSUPPLYPIPING
s%LECTRICALPOWER
Check area around boiler. Remove any combustible materials, gasoline and other flam-
mable liquids.
Failure to keep boiler area clear and free of combustible materials, gasoline
and other flammable liquids and vapors can result in severe personal injury,
death or substantial property damage.
Boiler must be installed so that gas control system components are protected from drip-
ping or spraying water or rain during operation or service.
If new boiler will replace existing boiler, check for and correct system problems, such as:
s3YSTEMLEAKSCAUSINGOXYGENCORROSIONORSECTIONCRACKSFROMHARDWATERDEPOSITS
Codes & Checklist