Overview of Primary Product

1
2
3
4
5
6
Part Number 550-141-186/0914

s)NSTALLATIONs3TART5Ps-AINTENANCEs0ARTS
;

(systems above 140°F)
7EIL-C,AINRECOMMENDSPIPING
as shown in
Figure 15. For single
boilers, pipe as shown for one unit.
3IZESECONDARYBOILERPUMP'0-
FOR&TO&TEMPERATURE RISE
through boiler. Secondary boiler
pump head will be very low. Cal-
culate only secondary piping circuit
resistance. Boiler resistance will not
exceed 6” w.c.
0RIMARY PUMP '0- AND HEAD
calculation should not include
secondary boiler circuits. Primary
pump can operate continuously
during heating season.
$ISTANCEvORLESS
Flow/check valve.
Hand valve.
%XPANSIONTANKSRELIEFVALVESAND
OTHERACCESSORIESAREREQUIREDBUT
not shown.
#

The boiler must be installed so that
chilled medium is piped in parallel
with the heating boiler with appro-
priate valves to prevent the chilled
medium from entering the boiler.
See
Figure 16. Consult AHRI In-
stallation and Piping Guides.
If boiler is connected to heating
coils located in air handling units
where they can be exposed to
refrigerated air, gravity circula-
tion during cooling cycle must be
prevented with flow control valves
or other automatic means.
*0
*1