Overview of Primary Product

Part Number 550-141-186/0914

s)NSTALLATIONs3TART5Ps-AINTENANCEs0ARTS
10b
Maintenance — minimum schedule
"

Repair leaks at
once
No petroleum-
based chemicals
 #HECKFORLEAKSINBOILERANDPIPING)FFOUNDREPAIRATONCE
2. Visually inspect pilot and burner flames. Refer to Check pilot burner flames and Check
main burner flame, Section 10c
PAGE
3. Visually inspect venting system for blockage, deterioration or leakage. Refer to Inspect
venting system, Section 10c
PAGE
Leaks must be repaired at once. Failure to do so can cause damage to boiler,
resulting in substantial property damage.
Do not use petroleum-based sealing compounds in boiler system. Severe
damage to boiler will result.
$

Follow Annual shutdown procedure, Section 10cPAGE


 #HECKTHATBOILERAREAISFREEFROMCOMBUSTIBLEMATERIALSGASOLINEANDOTHERmAMMABLE
VAPORSANDLIQUIDS
2. Check for and remove any obstruction to flow of combustion or ventilation air.


 #HECKRELIEFVALVE2EFERTORELIEFVALVEMANUFACTURERSINSTRUCTIONSONRELIEFVALVETAG
2. Test low water cutoff, if used. Blowdown if low water cutoff is float type. Refer to low water
cutoff manufacturer’s instructions.


 !NNUALSERVICECALLBYAQUALIlEDSERVICEAGENCY
2. Check burners and flueways and clean if necessary. Refer to Clean boiler heating surfaces
and Clean main burners, Section 10cPAGE
3. Follow procedure,
Section 8, Placing boiler in operation, page 26.
4. Visually inspect pilot and burner flames. Refer to Check pilot burner flames and Check
main burner flame, Section 10c
ONPAGE
5. Visually inspect venting system for blockage, deterioration or leakage. Refer to Inspect
venting system, Section 10c,
PAGE
6. Visually inspect base insulation. Refer to
Inspect base insulation, Section 10cPAGE
7. Check operation of low water cutoff, if used, and additional field-installed controls. Refer
to control manufacturer’s instructions.
8. Check that boiler area is free from combustible materials, gasoline and other flammable
VAPORSANDLIQUIDS
 #HECKFORANDREMOVEANYOBSTRUCTIONTOmOWOFCOMBUSTIONORVENTILATIONAIR
 ,UBRICATECIRCULATORSIFREQUIREDPERCIRCULATORMANUFACTURERSINSTRUCTIONS