Install Instructions

DIRECT VENT — 6ERTICALCONCENTRIC (continued)
2. Place roof penetrations to obtain minimum clearance of
12 inches between the edges of adjacent vent pipes of other boil-
ers for U. S. installations (see Figure 36). For Canadian instal-
lations, provide clearances required by CSA B149.1 or B149.2
Installation Code and a ULC S636 compliant vent kit.
3. The air inlet of a ECO boiler is part of a direct vent connection. It
is not classified as a forced air intake with regard to spacing from
adjacent boiler vents.
0REPAREROOFPENETRATIONS
1. Roof penetration hole:
a. Cut a clearance hole to clear the termination outside diameter
as prescribed in the kit instructions.
b. Insert a galvanized metal thimble in the vent pipe hole.
2. Follow all local codes for isolation of vent pipe when passing
through floors, ceilings and roofs.
3. Provide flashing and sealing boots sized for the concentric termi-
nation outside diameter.
-OUNTCONCENTRICTERMINATION
1. Assemble the vent termination as described for concentric termi-
nations, on page 34.
2. Mount the termination as shown in Figure 37.
3. Support the concentric vent/air termination at the roof penetration
as shown in Figure 37 or per concentric kit instructions.
s The supports/bracing used must support the termination
assembly to prevent vertical slippage or sideways movement.
s The clamps used on the outside of the termination pipe must
not cut into the pipe or contain sharp edges that could cause
a crack to form.
The vent and air piping must be securely supported,
and must not rest its weight on the boiler fittings. DO
NOT drill or screw into either the vent pipe or air pipe.
Failure to properly support the vent and air piping could
result in vent piping damage, resulting in possible severe
personal injury, death or substantial property damage.
When inserting the partially-assembled termination kit
through the roof penetration, wrap plastic or other pro-
tection over the end of the exposed assembly to prevent
debris from entering the pipes. If the air passages become
blocked, the boiler will not operate. Once the rain cap
has been cemented to the assembly, there is no way to
correct the problem. The assembly would have to be re-
placed if it were cut to be removed and cleaned. Altering
the assembly in any way could result in severe personal
injury or death due to toxic flue product emissions.
If using AL29-4C stainless vent pipe, use the vent pipe
manufacturer’s PVC adapter if connecting to a PVC
concentric vent attachment.
Do not connect any other appliance to the vent pipe or
multiple boilers to a common vent pipe.
4. After the assembly has been positioned in the roof opening and
all supports have been attached, install a bird screen (purchased
separately if not included with the kit) and rain cap as follows:
a. Place the bird screen on the end of the inner pipe as in Fig-
ure 38, page 34, or per kit instructions for polypropylene kits.
b. Cement the rain cap in place.
&IGURE Vertical termination — 3” PVC concentric
— single or multiple boilers
&IGURE 3” PVC concentric termination supports
See notices on previous page.
Part number 550-142-122/0513
33
TM
GAS-FIRED WATER BOILERBoiler Manual