Install Instructions

AQUA PLUS indirect-fired water heatersProduct Manual
Wiring — zoning with zone valves
Notes
Also refer to the WMZV
manual and Weil-McLain
Boiler Zone Wiring Guide
for further details.
Refer to Wiring require-
ments on page 20.
System piping
Figure 9, page 13
Figure 10, page 14
Install all zone valves per valve
manufacturer’s instructions.
1. This drawing is conceptual
only. It shows representa-
tive components and wir-
ing. Weil-McLain does not
represent that this drawing
meets any particular me-
chanical or building codes.
The installer is respon-
sible for inclusion of all
required safety devices, or
other miscellaneous pip-
ing hardware not shown
on drawing. The installer
is responsible for proper
sizing / selection of all
hardware shown on this
diagram.
2. Follow component manu-
facturer’s instructions for
installation of all items
shown.
3. See boiler manual for spe-
cific details on installing
the boiler.
Figure 19 Typical wiring — zoning with zone valves — DHW priority with Weil-McLain WMZV Zone Valve Zone Controller
GV90+ or Ultra gas boilers:
DO NOT apply the drawings in this manual. Refer only to the boiler manual.
Part number GL-E223-ADOC 0311
22