Operating instructions

Part number 550-141-887/0800
22
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
10a Operation sequence
Figure 17 shows the AHE boiler control module sequence of operation with status light indications. For more
information, refer to Troubleshooting” section beginning on page 32.
Figure 17 Control module sequence of operation
1. Standby
Waiting for call for heat
·
2. Call for heat
·
·
Circulator on
Blower on
3. Limit circuit
·
·
Limit controls closed
Block switch contacts closed
4. Pressure circuit
·
·
Pressure switch contacts
closed
Ignitor heating
5. Flame proven
·
·
·
Gas valve open
Ignitor remains on
Boiler producing heat
6. Limit cycle
·
·
Limit circuit open
Gas valve closed
7. Flame outage *
·
·
Flame out
Boiler recycles
8. Thermostat satisfied
·
·
Circulator off
Blower postpurge
* If flame is not proven in 4 seconds, boiler recycles 2 times to retry for ignition before going into lockout. Recycle igniter timing is 30
seconds. Postpurge and prepurge are performed on every cycle. In event of lockout, ignition control will automatically restore sequence
of operation after either:
1 hour waiting period.
Opening and closing of thermostat circuit.
Removal of 120 VAC power for at least 45 seconds.
POWER TSTAT
CIRC
LIMIT
PRESS
SWITCH
FLAME
Call for
heat?
Timing
or
= "ON" = "OFF"
NO
NO
YES
YES
YES
YES
YES
YES
35 sec
6 sec
30 sec
Steps
(Following step 8, cycle goes back to step 1.)
88730