Installation Instruction

4
Tools and Parts
Gather the required tools and parts before starting installation.
Tools needed for all installations:
Level
Tape measure
Pliers
Flat-blade screwdriver
#2 Phillips screwdriver
Adjustable wrench that
opens to 1" (25 mm) or
hex-head socket wrench
Tin snips (new vent
installations)
Caulking gun and
compound (for installing
new exhaust vent)
Vent clamps
1/4" nut driver or socket
wrench (recommended)
Utility knife
INSTALLATION REQUIREMENTS
Putty knife
Parts needed (steam models):
“Y” connector
Short inlet hose
Inlet hose
Rubber washer
Parts package is located in dryer drum. Check that all parts
are included.
Parts supplied (all models):
Tools needed for gas installations:
8" (203 mm) or 10"
(254 mm) pipe wrench
8" (203 mm) or 10"
(254 mm) adjustable wrench
(for gas connections)
Pipe-joint compound
resistant to propane gas
Leveling legs (4)
(Length and appearance of legs may vary according to model)
Wire Stripper (direct wire
installations)
or