Manual

11.
Connect Power Wires.
a. Connect black and white wires from power supply
to corresponding black and white wires in the air
cleaner junction box. (See figure 18.)
b. Connect ground wire (green or bare wire) from
power source to green grounding wire in junction
box.
c. Install electrical enclosure cover with three screws.
(See figure 2.)
12. Install the cell.
a. Grasp the cell firmly, holding it at a slight angle
with the cabinet (out at bottom). The arrow on top
of cell should point inward.
b. Insert cell at the top and engage retaining pins
(FIG. 19)into their respective cell-retaining slots,
then slide cell outward until retaining pins are at
bottoms of slots.
c. Allow cell to swing inward at the bottom, pushing
slightly until it "clicks" over the safety spring clip
at bottom center of cabinet.
d. Continue to push cell inward at bottom until it
latches into the spring clips {one at each side of
cabinet). Make sure both clips are latched. (See
FIG. 19).
13. Install screen and grille.
a. Drop screen behind two screen clips at bottom of
cabinet and fasten at upper edge with two spring
retainer latches. (See FIG. 2)
b. Engage pins at lower edge of grille into their mating
hinges. Slide grille toward the right until hinge pins
are fully seated.
c. Leave grille open until after operational tests have
been performed.
CAUTION: When installing the cell on ceiling
installations, make sure it is latched securely in cell
frame before releasing it. (See figure 20.)
00
r-- o lh
I _.._ i'_ //Z/4IWHITE(SUPPLY)
II _
\\ _LACK CSUPPLY)
h / (GREENORBARE).
/ / \"
GREEN GROUND WIRE r-]
II
Figure 18
CELL RETAINING SLOTS
ARROW MUST
POINT INWARD
RETAININ G
PIN,
/
GRILLE
_SCREE'N CLIP
/
/
/
/<-..
/ SCREEN
/
/
J
HINGE PIN
Figure 19
Figure 20
CHECK
SAFETY LATCH