User manual

17FX 250 / FX 500 User Manual
4.2.4 Powering Up The System
1. Use the ON/OFF switch on the BDU’s front
panel.
1. Wait for all LED indicators to turn green to
indicate the system is completely power
up. Refer the table below for meaning of
the status indicators.
LED Name Status Meaning
TERMINAL
Steady Amber BDU is powering up
Steady Green BDU has powered up successfully.
Steady Red BDU detects failure.
Blinking Amber Switching OFF BDU
ANTENNA
Steady Amber ADU is powering up.
Steady Red ADU is not OK/Error
Blinking Amber ADU is calibrang.
Blinking Green System performs satellite search
Steady Green ADU has locked on to the satellite
REGISTERED
Steady Amber Aempng network registraon
Steady Red Network failure/Error
Blinking Amber Ready for voice only
Blinking Green Ready for packet data only
Steady Green Ready for all (Voice and Data)