User Guide

MAINTENANCE
CUTTER 24V (SCE) 86037020 04/04/07
4-1
SERVICE SCHEDULE
MAINTENANCE DAILY WEEKLY MONTHLY ANNUALLY
Check battery acid level *
Check vac hose connections *
Clean the squeegee blades *
Inspect brushes or pads for debris:
wire string, wear
*
Inspect vac fan shut off float screen *
Drain & rinse tanks *
Raise squeegee assembly *
Raise scrub deck assembly *
Charge the batteries. *
Remove the pad drivers/brushes *
Check the brushes/pads for damage
and/or wear
*
Clean squeegee blades. *
Clean recovery tank shut off & screen *
Check battery cells w/ hydrometer *
Check solution strainer *
Check pivot points, caster and
squeegee for proper lubrication
*
Inspect tank and hoses *
Clean tops of batteries and tray *
Check battery cable clamps *
Use a vacuum to remove lint from the
motor windings
*
Grease casters *
Grease axle bearings *
Inspect all motors for carbon motor
brush wear
*
Before
starting
the work
p
eriod
End of
work
p
eriod
before
storing