Installation Guide

R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
5
4
FREESTANDING FAUCET
R
WOODBRIDGE
7
8
www.woodbridgebath.com
Hot Cold
Hot
Cold
Step 5: Locate the faucet assembly onto the rough valves from
oor, and secure the connecon of inlet supply lines to the valves.
DO NOT reverse the Hot and Cold supply.
6
Step 6: Secure the mounng tripod onto the oor using the
aħached mounng screws.
Step 7: Use the explosive screw to x the base on the oor and
place the base cover over the valve.
Step 8: Make sure the black gasket is in the hose end with ats,
thread hose onto outlet and ghten it. Turn the supply lines on
and turn the handle to full operate posion, hold the hose inside
the tub and let it ush for one minute.
Black gasket