Installation Guide
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
5
4
FREESTANDING FAUCET
R
WOODBRIDGE
7
8
www.woodbridgebath.com
Hot Cold
Hot
Cold
Step 5: Locate the faucet assembly onto the rough valves from
floor, and secure the connecধon of inlet supply lines to the valves.
DO NOT reverse the Hot and Cold supply.
6
Step 6: Secure the mounধng tripod onto the floor using the
aħached mounধng screws.
Step 7: Use the explosive screw to fix the base on the floor and
place the base cover over the valve.
Step 8: Make sure the black gasket is in the hose end with flats,
thread hose onto outlet and ধghten it. Turn the supply lines on
and turn the handle to full operate posiধon, hold the hose inside
the tub and let it flush for one minute.
Black gasket