Operating instructions
30
For contractors
J
–
N
.
K
a Push the cable grommet over the power cable.
b Break out the cable grommet knock-out in the back panel.
moved to the bottom.
d Slide the back panel over the studs and the cable grommet, pull the cable grommet with a pair of pliers
against the locking hooks and let
J
).
Please note:
Mark the type plate with a permanent marker:
Cross out IP 25 and tick the IP 24 box.
4.3 Priority control
L
When used in conjunction with other electrical equipment, e.g. electric storage heaters, use the maximum
demand relay:
a Maximum demand relay (see "8. Special accessories").
b Control cable to the contactor of the second appliance (e.g. electrical storage heater).
c Control contact, opens when switching the instantaneous water heater ON.
The relay trips as soon as the instantaneous water heater starts.
N
(see "8. Special accessories"):
(part of the standard delivery of the ZANKER pressure-tested tap).
delivery of the tap and is designed to hold the tap pipes in the designated location as well as to ensure the
necessary protection against moisture (
M
23).
Push the tap pipes from above through the support plate up to the lower part of the back panel.
the back panel.
The appliance cap needs to be prepared for this installation:
Cleanly break out the knock-outs in the appliance caps (
M
part of the appliance with two additional screws (
M
19).
Cap installation:
Hook the appliance cap at the top and pivot it down onto the back panel, then make it audibly click into
4. Alternative installation methods for contractors